X-Git-Url: https://pwan.org/git/?p=certmaster.git;a=blobdiff_plain;f=docs%2Fcertmaster-sync.pod;fp=docs%2Fcertmaster-sync.pod;h=6c4fbe006c6fe4876916ebdfd2fd36332a2b728c;hp=1519387b461ce3273fe4c37d08f97734ace2b3db;hb=62dcbd84977206450edf4c6e6739371ae6dadadb;hpb=67070b83b2873cd26228d5002989cae73ead0167 diff --git a/docs/certmaster-sync.pod b/docs/certmaster-sync.pod index 1519387..6c4fbe0 100644 --- a/docs/certmaster-sync.pod +++ b/docs/certmaster-sync.pod @@ -1,6 +1,6 @@ =head1 NAME -certmaster-sync -- syncronize client certificates with Func. +certmaster-sync -- synchronize client certificates with Func. =head1 SYNOPSIS @@ -8,11 +8,11 @@ certmaster-sync [-f|--force] =head1 DESCRIPTION -certmaster-sync syncronizes client certificates amongst certmaster clients via Func. It is assumed that the hosts who have requested certificates are reachable via Func for syncronization operations. +certmaster-sync synchronizes client certificates amongst certmaster clients via Func. It is assumed that the hosts who have requested certificates are reachable via Func for synchronization operations. -certmaster-sync by default is called as a post-sign and post-clean trigger. In order to enable syncronization you must set B to B, see B below. +certmaster-sync by default is called as a post-sign and post-clean trigger. In order to enable synchronization you must set B to B, see B below. -The syncronization occurs by querying remote Func methods in B on the minion hosts. This will gather information, copy any new certificates, and remove any certificates that have been cleaned. +The synchronization occurs by querying remote Func methods in B on the minion hosts. This will gather information, copy any new certificates, and remove any certificates that have been cleaned. =head1 OPTIONS @@ -30,7 +30,7 @@ Override the configuration value for B in F determines whether or not the script will actually syncronize or if it will exit with no operation. You can use -f|--force to override this configuration value. (Default: False) +B determines whether or not the script will actually synchronize or if it will exit with no operation. You can use -f|--force to override this configuration value. (Default: False) =back